Decisions Government must take
- conditions met
- 1/11
- Can stop the programme
- 4
Blocked4
2 May serviced land lawfully be valued and charged for?
Not startedThe largest single saving comes from charging for land the State currently grants at no cost. If investment law forbids it, most of the improvement disappears.
Without land pricing the programme loses the bulk of its value.
- Who signs
- Council of State, Ministry of Justice
- Area
- Legal
- Holds up
- 3
- Open evidence gap
- GAP-LEGAL-OPINIONS
3 Would a settlement entitlement count as public debt?
Not startedIf it scores as debt at face value, it does not relieve the budget; it relabels a liability and adds a discount on top.
If it scores as debt, a plain deferred payment is the cheaper choice.
- Who signs
- Ministry of Finance and the Board of Supreme Audit
- Area
- Fiscal
- Cannot start until
- 2
6 Has any body undertaken in writing to accept settlement?
Not startedAn entitlement is worth what a named authority has committed to honour. Identified capacity that nobody has confirmed is worth nothing to the holder.
The coverage test refuses every issuance.
- Who signs
- Each named right owner, with Ministry of Planning
- Area
- Market
- Open evidence gap
- GAP-REDEMPTION-INVENTORY
11 Will Ministry of Planning carry settlement inside existing procurement?
Not startedThe programme deliberately builds no tender platform. It needs the existing one to handle settlement after award, without touching how bids are evaluated.
Settlement has no lawful route into procurement.
- Who signs
- Ministry of Planning
- Area
- Procurement
- Open evidence gap
- GAP-MOP-INTEGRATION
Ready to decide6
1 Is every load-bearing figure traceable to a source?
Partly metSeveral figures the case rests on appear only in a written brief describing a meeting whose recording the programme does not hold. A decision of this size cannot rest on an account nobody can check.
Figures that cannot be traced are struck from the appraisal.
- Who signs
- Programme, independently reviewed
- Area
- Evidence
- Open evidence gap
- GAP-AUDIO-82M
4 Would the instrument be regulated as a security?
Not startedA transferable claim on the State may fall inside the securities perimeter, which changes who regulates it and how it may be traded.
The instrument would need a different legal vehicle.
- Who signs
- Central Bank of Iraq, Iraqi Securities Commission
- Area
- Legal
- Cannot start until
- 3
5 Does a ten-year fiscal model with Iraqi inputs support the case?
Partly metThe modelling framework exists. The Iraqi data it needs — real receipts, real absorption, real timing — does not.
The fiscal position stays modelled rather than measured.
- Who signs
- Ministry of Finance
- Area
- Fiscal
- Cannot start until
- 3
8 What discount would investors actually apply?
Partly metThe case assumes investors would accept a discount at or below 35%. Nobody has asked them.
Above 35% the instrument is worse than paying cash competitively.
- Who signs
- Programme, with an external facilitator
- Area
- Market
- Open evidence gap
- GAP-MARKET-SOUNDING
9 Are pilot sites ready, and is an affordability threshold published?
Not startedThe programme promises occupied, affordable homes. Neither the published threshold nor the sites exist yet.
Outcome verification has nothing to test against.
- Who signs
- Ministry of Construction and Housing, and the governorate
- Area
- Housing
10 Are there enough independent verifiers, and are they insured?
Not startedIndependent verification is the control everything else depends on. It needs qualified people who carry liability.
Verification becomes a bottleneck, or a formality.
- Who signs
- Programme, independently surveyed
- Area
- Institutional
- Open evidence gap
- GAP-VALIDATOR-CAPACITY
Settled1
7 Have the alternatives been appraised on equal terms?
MetNo mechanism may be adopted without being compared against the others on identical assumptions.
Met. Fifteen candidate designs appraised on one assumption register.
- Who signs
- Programme, independently validated
- Area
- Evidence