Decisions Government must take

Eleven conditions stand between this programme and a lawful decision to proceed. Four of them can stop it outright. One is met.
Government decision required
conditions met
1/11
Can stop the programme
4

Blocked4

Ready to decide6

  • 1

    Is every load-bearing figure traceable to a source?

    Partly met

    Several figures the case rests on appear only in a written brief describing a meeting whose recording the programme does not hold. A decision of this size cannot rest on an account nobody can check.

    Figures that cannot be traced are struck from the appraisal.

    Who signs
    Programme, independently reviewed
    Area
    Evidence
    Open evidence gap
    GAP-AUDIO-82M
  • 4

    Would the instrument be regulated as a security?

    Not started

    A transferable claim on the State may fall inside the securities perimeter, which changes who regulates it and how it may be traded.

    The instrument would need a different legal vehicle.

    Who signs
    Central Bank of Iraq, Iraqi Securities Commission
    Area
    Legal
    Cannot start until
    3
  • 5

    Does a ten-year fiscal model with Iraqi inputs support the case?

    Partly met

    The modelling framework exists. The Iraqi data it needs — real receipts, real absorption, real timing — does not.

    The fiscal position stays modelled rather than measured.

    Who signs
    Ministry of Finance
    Area
    Fiscal
    Cannot start until
    3
  • 8

    What discount would investors actually apply?

    Partly met

    The case assumes investors would accept a discount at or below 35%. Nobody has asked them.

    Above 35% the instrument is worse than paying cash competitively.

    Who signs
    Programme, with an external facilitator
    Area
    Market
    Open evidence gap
    GAP-MARKET-SOUNDING
  • 9

    Are pilot sites ready, and is an affordability threshold published?

    Not started

    The programme promises occupied, affordable homes. Neither the published threshold nor the sites exist yet.

    Outcome verification has nothing to test against.

    Who signs
    Ministry of Construction and Housing, and the governorate
    Area
    Housing
  • 10

    Are there enough independent verifiers, and are they insured?

    Not started

    Independent verification is the control everything else depends on. It needs qualified people who carry liability.

    Verification becomes a bottleneck, or a formality.

    Who signs
    Programme, independently surveyed
    Area
    Institutional
    Open evidence gap
    GAP-VALIDATOR-CAPACITY

Settled1

  • 7

    Have the alternatives been appraised on equal terms?

    Met

    No mechanism may be adopted without being compared against the others on identical assumptions.

    Met. Fifteen candidate designs appraised on one assumption register.

    Who signs
    Programme, independently validated
    Area
    Evidence